Public Works
Project Status Updates
Click on a project name below to access a description and scheduling information. The information is current as of October 2009.
CONSTRUCTION PROJECTS- Aqui Esta Drive Improvements
- Burnt Store Road Widening Project - Phase 1
- Cape Haze Drive Bridge Replacement
- Cape Horn Entry Feature Landscaping
- Coral Creek Bridge Replacement
- Edgewater/Flamingo Corridor Phase 1
- Fordham Waterway Bridges at US 41 Service Roads
- Kings Highway Widening
- Midway Boulevard Widening Phase 1
- Northwest Port Charlotte Bridge Rehabilitation
- Piper Road Widening South
- Sales Tax Year One Sidewalks
- South Gulf Cove Entry Features
- Toledo Blade Boulevard Widening Phase 2
- Winchester Boulevard South
- Chancellor Drainage Control Structure at Apollo Waterway
- Chancellor Drainage Control Structure at Cheshire Waterway
- Chancellor Drainage Control Structure at Jupiter Waterway
- Greater Port Charlotte Water Control Structures Design
- Lionheart Water Control Structure
- Manasota Key Phase 1 and 2 Construction
- Midway Boulevard Water Control Structures Phase 1
- Oyster Creek Clearing
- Rotonda Weirs
- Sunset Water Control Structure
- Three Lakes Project/Lake 1 Excavation
- US 41 Storm Structures
DREDGING PROJECTS
- Gulf Cove Waterway Dredging
- Harbour Heights Waterway Maintenance Dredging
- Northwest Charlotte Maintenance Dredge
PAVING PROJECTS
SALES TAX PROJECTS
- 2009 Sales Tax Projects Overview (BCC Presentation) - MS Powerpoint or PDF
